  • Provision of lighting/data, heating and PH services

  • AV install for presentation area

  • Fire alarm modifications, alarm and access control

  • Specialised extract system for workshop areas for woodwork/metalwork/ceramics

  • Lab environment for electrictronics/textiles activities

  • Ramped entrance to loading bay laid to levels with structural concrete slab to half way through the site creating a split between the presentation and workshop areas

  • 10T platform lift modified to travel to new FFL in presentation area

  • Disabled lift installed to access lower workshop area

  • Full height slot cut into the side of the building fabric to create a protruding, glazed slot from creative space into the adjacent pedestrian walkway

  • Bespoke glazed/stainless steel/timber joinery for display purposes

  • Fire rated, glazed lobby area formed and new entrance from adjacent Engineering Building constructed

  • Full height, glazed roller shutters installed

  • PPC aluminium façade work undertaken to the front of the space and around the roller shutter door, incorporating a cantilevered, louvred box canopy to serve the basement fresh air intake

  • Decorations 

 

The creative space has retained it’s 10T gantry crane and platform lift to provide access to the Engineering faculty in the basement when they require plant/machinery deliveries and experimental engines.

UNIVERSITY COLLEGE LONDON

"Working with Rob was a real pleasure. He was highly organised with an appreciation of the bigger picture, great communication skills and drive to achieve excellence. He engaged wholeheartedly with me as the client and understood the high standards and quality of materials, finishes and detailing the Institute of Making required. Throughout the process of building our new home, Rob worked tirelessly to make the creative vision a reality."

 

 

Dr Zoe Laughlin
Creative Director
Institute of Making
University College London